Financial planning and cost control as determining factors for efficiency in civil construction
Financial planning and cost control as determining factors for efficiency in civil construction
DOI:
https://doi.org/10.51473/rcmos.v1i1.2025.2234Keywords:
construction, financial planning, cost controlAbstract
Construction projects are subject to technical, financial, and organizational constraints that make predictability a central asset for project performance. In this context, even technically consistent undertakings may lose efficiency when they lack adequate financial planning, reliable cost estimation, cost-schedule integration, and continuous monitoring mechanisms. This article analyzes the roles of financial planning and cost control as determinants of construction efficiency, considering how budgeting, contingency, cash flow, physical scheduling, and managerial control interact throughout the project cycle. This is a qualitative, exploratory, and descriptive study based on a systematic literature review and documentary analysis. The corpus included international literature on construction cost management, Brazilian technical and institutional references, and national studies on production planning and control in construction projects. The findings indicate that economic-financial efficiency does not result from mere cost-cutting, but from the ability to structure budgets based on feasible quantities and assumptions, incorporate contingencies compatible with project uncertainty, integrate cost and time, monitor deviations, and act on their causes. It is concluded that financial planning and cost control are not secondary tasks, but structural dimensions of sound engineering and efficient management, playing a decisive role in reducing waste, preventing delays, rationalizing resource allocation, and increasing project reliability.
Downloads
References
ALVARENGA, Felipe Campos; MAUÉS, Luiz Maurício Furtado; SANTOS JÚNIOR, Paulo Cerqueira dos; MACEDO, Alcebíades Negrão. Alterações de custos e prazos em obras públicas. Ambiente Construído, Porto Alegre, v. 20, n. 1, p. 95–111, 2020. Disponível em: https://seer.ufrgs.br/ambienteconstruido/article/view/96697.
BARDIN, Laurence. Análise de conteúdo. São Paulo: Edições 70, 2016.
BRASIL. Tribunal de Contas da União. Orientações para elaboração de planilhas orçamentárias de obras públicas. Brasília: TCU, 2014.
CAIXA ECONÔMICA FEDERAL; INSTITUTO BRASILEIRO DE GEOGRAFIA E ESTATÍSTICA. SINAPI: metodologias e conceitos. 10. ed. Brasília: CAIXA, 2025.
CELLARD, André. A análise documental. In: POUPART, Jean et al. A pesquisa qualitativa: enfoques epistemológicos e metodológicos. 2. ed. Petrópolis: Vozes, 2012. p. 295–316.
FLICK, Uwe. Introdução à pesquisa qualitativa. 3. ed. Porto Alegre: Artmed, 2009.
GIL, Antonio Carlos. Métodos e técnicas de pesquisa social. 7. ed. São Paulo: Atlas, 2019.
HANIOĞLU, Mehmet Nihat. A cost-based approach to project management: planning and controlling construction project costs. New York: Routledge, 2023. DOI: https://doi.org/10.1201/9781003172710
LAKATOS, Eva Maria; MARCONI, Marina de Andrade. Fundamentos de metodologia científica. 8. ed. São Paulo: Atlas, 2017.
MOURA, Camile Borges; FORMOSO, Carlos Torres. Análise quantitativa dos indicadores de planejamento e controle da produção: impactos do sistema Last Planner e fatores que afetam sua eficácia. Ambiente Construído, Porto Alegre, v. 9, n. 4, p. 81–97, 2009.
MUIANGA, Elisa Atália Daniel; GRANJA, Ariovaldo Denis; RUIZ, Joyce de Andrade. Desvios de custos e prazos em empreendimentos da construção civil: categorização e fatores de influência. Ambiente Construído, Porto Alegre, v. 15, n. 1, p. 79–97, 2015. Disponível em: https://seer.ufrgs.br/index.php/ambienteconstruido/article/view/47770. DOI: https://doi.org/10.1590/S1678-86212015000100008
POTTS, Keith; ANKRAH, Nii. Construction cost management: learning from case studies. 2. ed. Abingdon: Routledge, 2013. DOI: https://doi.org/10.4324/9780203752944
SEVERINO, A. J. Metodologia do trabalho científico. 24. ed. São Paulo: Cortez, 2016.
VARGAS, Fabrício Berger de; FORMOSO, Carlos Torres. Método para planejamento e controle da produção baseado em zonas de trabalho com o apoio de BIM. Ambiente Construído, Porto Alegre, v. 19, n. 2, p. 41–60, 2019.
Published
Issue
Section
Categories
License
Copyright (c) 2026 Esthela Avancini Gomes (Autor)

This work is licensed under a Creative Commons Attribution 4.0 International License.